2024
DOI: 10.1177/03611981241252798
|View full text |Cite
|
Sign up to set email alerts
|

Pre-Support Method for Horizontal Overlapping Jet Grouting Columns for Very-Large Cross-Section Tunnels in Dry Silty Sand Strata: A Case Study

Xiaolong Guo,
Yubing Chen,
Xingliang Sun
et al.

Abstract: The Shangbai Tunnel on the Daxi Passenger Dedicated Line passes through unsaturated dry silty sand strata which is prone to sand leakage and gushing after disturbance, posing a significant threat to the safety and progress of construction work. Using the Shangbai Tunnel project as a case study, we conduct laboratory experiments to determine the physical and mechanical properties of dry silty sand layers and analyze the limitations of advanced large pipe shed pre-support and small pipe grouting pre-support stru… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 34 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?