Practical crash duration estimation for project schedule activities

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
5
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 31 publications
0
5
0
Order By: Relevance
“…The final decision to choose 60 days is the most appropriate if technical and external considerations aren't considered. The project acceleration for 60 days is highly recommended.According to prior research, the selection of acceleration time is based on optimizing the tradeoff of time and cost, and a proportional alternative from the cheapest cost with the fastest time is picked[34][35][36]. Consequently, to receive advantages equal to 60 days, the project must cover an additional IDR cost.…”
mentioning
confidence: 99%
“…The final decision to choose 60 days is the most appropriate if technical and external considerations aren't considered. The project acceleration for 60 days is highly recommended.According to prior research, the selection of acceleration time is based on optimizing the tradeoff of time and cost, and a proportional alternative from the cheapest cost with the fastest time is picked[34][35][36]. Consequently, to receive advantages equal to 60 days, the project must cover an additional IDR cost.…”
mentioning
confidence: 99%
“…Furthermore, the total acceleration time, the total acceleration cost, and the total acceleration cost per unit of time (cost slope) can be determined. Analysis using the Crashing method requires crash duration and crash cost to get the optimum value of construction execution (Fachrurrazi & Husin, 2021). The calculation formula of this method is as follows: Optimum crash activity is the activity that has the lowest cost slope value.…”
Section: Methodsmentioning
confidence: 99%
“…The crash duration was the time required to shorten the duration of work activities to shorter than normal [22]. An alternative acceleration treatment in the work activities increased productivity, resulting in a shorter duration than normal time.…”
Section: Crash Durationmentioning
confidence: 99%