2006
DOI: 10.1016/j.nima.2006.02.080
|View full text |Cite
|
Sign up to set email alerts
|

Power upgrade of the subcritical assembly in Dubna (SAD) to 100kW

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2008
2008
2022
2022

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…kW. An upgrade consisting in the replacement of part of the lead of the spallation target by tungsten or beryllium, which allowed a 2 kW proton beam without melting, was also investigated [272]. This upgrade would have allowed to increase the assembly power to 100 kW.…”
Section: Sadmentioning
confidence: 99%
“…kW. An upgrade consisting in the replacement of part of the lead of the spallation target by tungsten or beryllium, which allowed a 2 kW proton beam without melting, was also investigated [272]. This upgrade would have allowed to increase the assembly power to 100 kW.…”
Section: Sadmentioning
confidence: 99%