1970
DOI: 10.1109/tpas.1970.292780
|View full text |Cite
|
Sign up to set email alerts
|

Power Transformen Short-Circuit Strength - Requirements, Design, and Demonstration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
19
0

Year Published

1986
1986
2019
2019

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 42 publications
(21 citation statements)
references
References 4 publications
0
19
0
Order By: Relevance
“…1 is given the classification of reasons and forms of damages, and also the schematic of the technical diagnosis of the transformer-reactor oil-filled equipment. (Lech and Tyminski, 1966;McNutt et al, 1970;Balakrishnan, 1989;Malewski and Khrennikov, 1995;Khrennikov, 1999;Khrennikov, 2000). On a quantity and the variety the methods of the diagnosis of the oil-filled equipment several times exceed the volume of the methods of diagnosis of overhead transmission lines, this is caused historically by closer attention to the reliability of the oil-filled equipment; by the same is caused the presence of a large quantity of finished effective systems "on-line" monitoring of the transformer equipment, for example, of such as control systems of bushings of R-1500, system of the checking of the transformer oil Hydran, TRANSFIX, TIM, TDM.…”
Section: Technical Condition State Of the Transformer-reactor Oil-filmentioning
confidence: 99%
See 4 more Smart Citations
“…1 is given the classification of reasons and forms of damages, and also the schematic of the technical diagnosis of the transformer-reactor oil-filled equipment. (Lech and Tyminski, 1966;McNutt et al, 1970;Balakrishnan, 1989;Malewski and Khrennikov, 1995;Khrennikov, 1999;Khrennikov, 2000). On a quantity and the variety the methods of the diagnosis of the oil-filled equipment several times exceed the volume of the methods of diagnosis of overhead transmission lines, this is caused historically by closer attention to the reliability of the oil-filled equipment; by the same is caused the presence of a large quantity of finished effective systems "on-line" monitoring of the transformer equipment, for example, of such as control systems of bushings of R-1500, system of the checking of the transformer oil Hydran, TRANSFIX, TIM, TDM.…”
Section: Technical Condition State Of the Transformer-reactor Oil-filmentioning
confidence: 99%
“…The development of the methods of diagnosis, especially used during the TREE service, will make it possible to switch over from the system of regular overhauls to repair system due to the technical state (TS) (Lech and Tyminski, 1966;McNutt et al, 1970).…”
Section: Technical Condition State Of the Transformer-reactor Oil-filmentioning
confidence: 99%
See 3 more Smart Citations