Abstract: SUMMARYA reliable electricity supply infrastructure is fundamental to modern living. An interruption to electricity services has such far reaching impact to our everyday lives to various industries compared to other service interruptions, thus to build in significant redundancy and various preventive measures to electric power system operation and planning is needed. Just as important as to incorporate redundancy and preventive measures however, an effective restoration plan needs to be in place since the poss… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(12 citation statements)
references
References 15 publications
0
12
0
Order By: Relevance
“…Worldwide energy demand by 2050 due to AC usage has expected to reach about 6205TWh. The IEA forecasted that global energy demand could be just 3407TWh if AC efficiency will be improved so that it becomes double [36]. It has been revealed from the above observations that ACs figures are growing day by day.…”
Section: Ac Demand and Load Forecastingmentioning
confidence: 99%
“…Worldwide energy demand by 2050 due to AC usage has expected to reach about 6205TWh. The IEA forecasted that global energy demand could be just 3407TWh if AC efficiency will be improved so that it becomes double [36]. It has been revealed from the above observations that ACs figures are growing day by day.…”
Section: Ac Demand and Load Forecastingmentioning
confidence: 99%
“…where t k is the total recovery time of zone k shown as formula (3), and n represents partitions count of the black-start system. t is the average number of all the subsystem recovery time delivered as Equation (8). As shown in Equation (7), H is dimensionless index, which represents integrated difference of all possible data t k deviating from the expected value t. Compared with the common standard deviation formula, an absolute amount, index H as a relative amount is able to express the dispersion degree of all sets of data under different expected value, whereas the former only can be applied under the same expected value condition.…”
Section: Subsystem Recovery Time Balance Indexmentioning
confidence: 99%
“…According to the characteristics of the black‐start, subsystem recovery time is taken seriously by many researchers as an important standard to judge whether the schemes are suitable or not. Ref introduces a black‐start partitioning method based on the characteristics of scale‐free networks. The nodes with many connections, hubs, are chosen to be restored first for reducing the total restoration time.…”
Section: Introductionmentioning
confidence: 99%
“…The process of power system restoration includes 3 stages: preparation, transmission paths reconfiguration, and load restoration . In the preparation stage, the black‐start (BS) units are commissioned, and then transmission paths are connected to crank non‐black‐start units (NBSU) in order to be started up .…”
Section: Introductionmentioning
confidence: 99%
“…The objective of this stage is mainly to maximize the generation capability. In this regard, many researchers have formulated this objective as an optimization problem . In El‐Zonkoly and Sun et al, authors propose an algorithm that formulates generator start‐up sequence as a mixed integer linear problem.…”
Section: Introductionmentioning