The Electric Power Engineering Handbook 2000
DOI: 10.1201/9781420036770.ch13
|View full text |Cite
|
Sign up to set email alerts
|

Power System Planning (Reliability)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 65 publications
0
6
0
Order By: Relevance
“…Power system planning is classified into two classes; facility planning and the operational planning [16]. Facility planning aims to install and expand the power networks over 5 to 30 years, while the operational planning is to plan for the existing facilities in a few minutes to 1 year [17]. The main objective in facility planning is to expand and develop power networks facilities such as addition of power generation systems, expansion and reinforcement of distribution and transmission networks considering technology development and load growth.…”
Section: Power System Engineeringmentioning
confidence: 99%
See 1 more Smart Citation
“…Power system planning is classified into two classes; facility planning and the operational planning [16]. Facility planning aims to install and expand the power networks over 5 to 30 years, while the operational planning is to plan for the existing facilities in a few minutes to 1 year [17]. The main objective in facility planning is to expand and develop power networks facilities such as addition of power generation systems, expansion and reinforcement of distribution and transmission networks considering technology development and load growth.…”
Section: Power System Engineeringmentioning
confidence: 99%
“…Facility planning considers the emerging technologies, technology development and load growth and to install new equipment and expand power girds in the upcoming 5 to 30 years [17]. The main aim of this planning is to guarantee having sufficient capacity by on-time and economic expansion of power networks.…”
Section: A Planningmentioning
confidence: 99%
“…1. Planning can be performed in three periods of long-term, short-term and operational planning [2], [18], [19]. The longand short-term planning is called facility planning, which is associated with developing the power system infrastructures, including installing generations, expanding transmission systems, and extending distribution systems, in order to support the customers considering the energy consumption growth.…”
Section: Concept Of Reliability In Power Systemsmentioning
confidence: 99%
“…The first one is the facility planning and the second one is the operational planning [5]. The time of interest for facility planning is 5 to 30 years and for the operational planning is from a few minutes to 1 year [6]. The aim of facility planning is to optimally and economically develope power systems such as addition of generation units, expansion and reinforcement of transmission, distribution networks considering load growth within a specific time.…”
Section: Multi-time Scale Power System Analysismentioning
confidence: 99%
“…A. Long-term planning Facility planning considers the load and technology growth in order to expand and install new facilities in the next 5 to 30 years [6]. The main objectives of long-term planning are the optimal and economical expansion of power systems in order to ensure adequate and secure power delivery.…”
Section: Multi-time Scale Power System Analysismentioning
confidence: 99%