2015
DOI: 10.1061/(asce)me.1943-5479.0000296
|View full text |Cite
|
Sign up to set email alerts
|

Possibilistic Moments for the Task Duration in Fuzzy PERT

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 14 publications
(10 citation statements)
references
References 31 publications
0
10
0
Order By: Relevance
“…This fact does not have transcendental implications on scheduling with crisp values, but with fuzzy values the equation must be solved as a Minkowski´s subtraction (Buckley and Eslami, ; Chrysafis and Papadopoulos, ) of the supports of the fuzzy number Equation , guarantying that the obtained solution always culminates in a positive confidence interval (Gil‐Aluja, ). If a fuzzy difference is applied, negative values can be obtained for the times of the activities, providing incorrect solutions: leftitalicLS¯i()xitalicDur¯i()x=italicLF¯i()xleft()lsi1,lsi2,lsi3()di1,di2,di3=()lfi1,lfi2,lfi3leftleftlsi1=trueprefixmin()lsi2,lfi1di1leftlsi2=lfi2di2leftlsi3=trueprefixmax()lsi2,lfi3di3…”
Section: The Proposed Fuzzy‐gpsp For Production Planning In Constructmentioning
confidence: 99%
See 1 more Smart Citation
“…This fact does not have transcendental implications on scheduling with crisp values, but with fuzzy values the equation must be solved as a Minkowski´s subtraction (Buckley and Eslami, ; Chrysafis and Papadopoulos, ) of the supports of the fuzzy number Equation , guarantying that the obtained solution always culminates in a positive confidence interval (Gil‐Aluja, ). If a fuzzy difference is applied, negative values can be obtained for the times of the activities, providing incorrect solutions: leftitalicLS¯i()xitalicDur¯i()x=italicLF¯i()xleft()lsi1,lsi2,lsi3()di1,di2,di3=()lfi1,lfi2,lfi3leftleftlsi1=trueprefixmin()lsi2,lfi1di1leftlsi2=lfi2di2leftlsi3=trueprefixmax()lsi2,lfi3di3…”
Section: The Proposed Fuzzy‐gpsp For Production Planning In Constructmentioning
confidence: 99%
“…Ponz-Tienda et al (2012) proposed a fuzzy scheduling model integrating a novel interpretation of Earned Value Indexes. The latest proposal was by Chrysafis and Papadopoulos (2014) with an alternative approach to Fuzzy-PERT based on possibilistic estimate for the mean to avoid the problem of the backward recursion.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Chrysafis and Papadopoulos [22] made a research effort to improve the fuzzy version of the program evaluation and review technique PERT and avoid the backward recursion problem. The tools for this operation were the possibilistic moments of fuzzy numbers.…”
Section: Introductionmentioning
confidence: 99%
“…They proposed a multi objective nonlinear mathematical model and an algorithm for solving the problem. Some of the other recent papers in the literature are conducted by Castro-Lacouture et al [25], Afshar and Fathi [26], Shi and Gong [27], Wang and Huang [28] , Bhaskar et al [29], Ponz-Tienda et al [30], Maravas and Pantouvakis [31], Xu and Zhang [32], Masmoudi and Haït [33], Huang et al [34] , Chrysafis and Papadopoulos [35], Huang et al [36], Yu et al [37], Yousefli [38], Zohoori et al [39], Habibi et al [40] Alipouri et al [41] and Birjandi and Mousavi [42]. As seen from the literature review of this paper, fuzzy project scheduling problems have been mostly investigated with fuzzy ranking methods, fuzzy simulation, and heuristic or metaheuristic.…”
Section: Introductionmentioning
confidence: 99%