2018
DOI: 10.1016/j.jup.2018.03.002
|View full text |Cite
|
Sign up to set email alerts
|

Positive Train Control (PTC) for railway safety in the United States: Policy developments and critical issues

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
9
1

Relationship

2
8

Authors

Journals

citations
Cited by 29 publications
(13 citation statements)
references
References 11 publications
0
13
0
Order By: Relevance
“…Current railroad industry implementation of PTC is expected to substantially reduce the occurrence of many of these accidents. 101 PTC is therefore a crucial element in SRC implementation. Consequently, further research on the specific types and circumstances of accidents that PTC is intended to prevent may enable further refinement of its capabilities and those circumstances where other approaches to improving train safety will be more effective.…”
Section: Discussionmentioning
confidence: 99%
“…Current railroad industry implementation of PTC is expected to substantially reduce the occurrence of many of these accidents. 101 PTC is therefore a crucial element in SRC implementation. Consequently, further research on the specific types and circumstances of accidents that PTC is intended to prevent may enable further refinement of its capabilities and those circumstances where other approaches to improving train safety will be more effective.…”
Section: Discussionmentioning
confidence: 99%
“…Here, it is assumed that the position of trains on the rail network is continuously monitored. While this is not always the case yet, positional tracking is commonly used as part of Positive Train Control (PTC) systems [30] and might utilise GPS (Global Positioning System) [31] [32] or alternative systems such as the Galileo satellite navigation system [31].…”
Section: B Schedule Implementation; Output From Scheduling Modulesmentioning
confidence: 99%
“…The monetary estimation structure is plotted in Figure 2. The categories include casualties, equipment damage, track and right-of-way damage, damage off the right-of-way, hazardous materials cleanup, evacuations, loss of lading, wreck clearing, and train delays ( 9 ). Since the amount in each cost factor deriving from FRA is in 2009 dollars, the estimated safety benefits have also been adjusted into 2017 constant dollars using the GDP inflator ( 5 , 10 ).…”
Section: Benefit-cost Analysismentioning
confidence: 99%