2020 12th International Conference on Information Technology and Electrical Engineering (ICITEE) 2020
DOI: 10.1109/icitee49829.2020.9271728
|View full text |Cite
|
Sign up to set email alerts
|

PMU Location Determination in a Hybrid PMU-SCADA System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
1
1
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 12 publications
0
2
0
Order By: Relevance
“…In accordance with the optimal PMU placement outlined in refs. [27][28][29][30]. As shown in Figure 3, in the IEEE-14 system, PMUs are placed at the optimal placement points of nodes 2, 6, 7, and 9.…”
Section: Pmu Observability Issuesmentioning
confidence: 99%
“…In accordance with the optimal PMU placement outlined in refs. [27][28][29][30]. As shown in Figure 3, in the IEEE-14 system, PMUs are placed at the optimal placement points of nodes 2, 6, 7, and 9.…”
Section: Pmu Observability Issuesmentioning
confidence: 99%
“…Due to this, stress on the transmission lines is increasing, differentiating normal and fault conditions is di cult, and knowing of power ow in the transmission lines in which direction is also complex [3]. Conventional power system monitoring methods SCADA and Energy Management Systems (EMS) give limited awareness about the power system in a steady state view [4]. In real time the voltage and current signals are continuous signals, and the instantaneous magnitude and phase angles of these signals change continuously.…”
Section: Introductionmentioning
confidence: 99%