IEEE EUROCON 2017 -17th International Conference on Smart Technologies 2017
DOI: 10.1109/eurocon.2017.8011220
|View full text |Cite
|
Sign up to set email alerts
|

PMU and DSA based wide area control system: Concept and application in large longitudinal system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 3 publications
0
5
0
Order By: Relevance
“…From the remaining 34 papers, 7 address frequency stability issues [127], [146], [150], [168], [235], [237], [257] and 10 papers address voltage stability [55], [149], [152], [184], [191], [194], [201], [244], [245], [260]. The remaining papers (17 in total) propose strategies addressing two or more kind of stabilities [123], [131], [143], [154], [160], [183], [205], [209], [224], [225], [226], [229], [234], [239], [243], [246], [247].…”
Section: ) Centralized Controlmentioning
confidence: 99%
See 2 more Smart Citations
“…From the remaining 34 papers, 7 address frequency stability issues [127], [146], [150], [168], [235], [237], [257] and 10 papers address voltage stability [55], [149], [152], [184], [191], [194], [201], [244], [245], [260]. The remaining papers (17 in total) propose strategies addressing two or more kind of stabilities [123], [131], [143], [154], [160], [183], [205], [209], [224], [225], [226], [229], [234], [239], [243], [246], [247].…”
Section: ) Centralized Controlmentioning
confidence: 99%
“…In most cases, a purely load shedding scheme is performed, such as in [62], [183], [184], [191], [201], [205]. [224], [225], [226], [229], [237], [239], [243], [244], [246], [247], [257], and [259]. Approaches using purely generation tripping schemes are less common, such as [204], [207], [219].…”
Section: ) Load Shedding and Generation Trippingmentioning
confidence: 99%
See 1 more Smart Citation
“…( ) = (7) The number of PMUs required for complete observability (while considering zero injection buses) for the IEEE-118 bus system is 29. They were placed on buses 3,8,11,12,17,20,23,28,34,37,40,45,49,52,56,62,65,72,75,77,80,85,86,91,94,102,105,110, and 114.…”
Section: =1mentioning
confidence: 99%
“…Direct methods for transient stability assessment employing Lyapunov stability were utilized in [4]- [7]. A variety of PMU-based indices for DSA including those for short-term voltage stability were explored in [8]. Beside the above-mentioned approaches, probabilistic methods, and dynamic state estimation have also been used for performing DSA [9]- [12].…”
Section: Introductionmentioning
confidence: 99%