2019
DOI: 10.1016/j.petrol.2018.10.049
|View full text |Cite
|
Sign up to set email alerts
|

Plug & abandonment of offshore wells: Ensuring long-term well integrity and cost-efficiency

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
64
0
2

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1
1
1

Relationship

2
8

Authors

Journals

citations
Cited by 210 publications
(66 citation statements)
references
References 32 publications
0
64
0
2
Order By: Relevance
“…Effective plugs may be installed by reaming the drillhole over a relatively short section, which is preferably located adjacent to a clay, shale or salt rock layer. The reamed drillhole section will be filled with a suitable backfill material, which will be compacted by the overburden and plastic deformation of the surrounding rock [50,51], effectively isolating the disposal section from the surface and at the same time sealing the excavation disturbed zone. Similar plugs may be installed throughout the disposal section to compartmentalize the disposal section, reducing the risk of axial radionuclide transport to transmissive zones that may intersect the drillhole.…”
Section: Backfilling and Sealingmentioning
confidence: 99%
“…Effective plugs may be installed by reaming the drillhole over a relatively short section, which is preferably located adjacent to a clay, shale or salt rock layer. The reamed drillhole section will be filled with a suitable backfill material, which will be compacted by the overburden and plastic deformation of the surrounding rock [50,51], effectively isolating the disposal section from the surface and at the same time sealing the excavation disturbed zone. Similar plugs may be installed throughout the disposal section to compartmentalize the disposal section, reducing the risk of axial radionuclide transport to transmissive zones that may intersect the drillhole.…”
Section: Backfilling and Sealingmentioning
confidence: 99%
“…Cement sheaths are among the most important barrier elements in both petroleum wells and CO 2 injection wells. To prevent leakages of downhole fluids, the cement sheath needs to retain its integrity throughout the entire lifetime of the well, i.e., during the production and injection phase, and also, after well abandonment [4,8,9]. There are different types of cement sheath failure modes [10][11][12][13][14], where the two most common and well-understood are radial cracks and microannuli.…”
Section: Introductionmentioning
confidence: 99%
“…CO 2 ) imposes extreme loadings on the cement sheath in both short and long-term in terms of pressure and temperature variations. Failure of cement sheath can lead to problems in the integrity of production or injection wells as well as after well abandonment [1,2]. Therefore, it is important to maintain the 1 Contact author: sohrabgheibie@gmail.com cement sheath failure.…”
Section: Introductionmentioning
confidence: 99%