2015
DOI: 10.1016/b978-0-444-63577-8.50135-2
|View full text |Cite
|
Sign up to set email alerts
|

Plantwide Predictive Monitoring of Sulfur Emissions in Tail Gas Treatment Units

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 10 publications
(9 reference statements)
0
1
0
Order By: Relevance
“…To increase the SRE, process modifications have been proposed, which include the installation of additional catalytic units, 9 the addition of a tail gas treatment unit (TGTU), 10 acid gas enrichment to increase feed quality, 7 optimization of the process variables, 11 moisture removal to overcome the equilibrium constraints of Claus reactions, 12 and oxygen enrichment. 13 The installation of an additional catalytic unit or an acid gas enrichment unit increases the capital and operating costs for a process that is already economically deficient, because of the low sale price of sulfur.…”
Section: Introductionmentioning
confidence: 99%
“…To increase the SRE, process modifications have been proposed, which include the installation of additional catalytic units, 9 the addition of a tail gas treatment unit (TGTU), 10 acid gas enrichment to increase feed quality, 7 optimization of the process variables, 11 moisture removal to overcome the equilibrium constraints of Claus reactions, 12 and oxygen enrichment. 13 The installation of an additional catalytic unit or an acid gas enrichment unit increases the capital and operating costs for a process that is already economically deficient, because of the low sale price of sulfur.…”
Section: Introductionmentioning
confidence: 99%