2019
DOI: 10.1061/(asce)co.1943-7862.0001637
|View full text |Cite
|
Sign up to set email alerts
|

Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(16 citation statements)
references
References 14 publications
0
14
0
Order By: Relevance
“…After conducting the VIF assessment, none of the variables’ VIF exceed 4, therefore the data used for the model remained unchanged. The multicollinearity assessment removes the concerns about multicolliniearity when using design parameters, which have been pointed out by authors in the past ( 7 , 8 )…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…After conducting the VIF assessment, none of the variables’ VIF exceed 4, therefore the data used for the model remained unchanged. The multicollinearity assessment removes the concerns about multicolliniearity when using design parameters, which have been pointed out by authors in the past ( 7 , 8 )…”
Section: Methodsmentioning
confidence: 99%
“…This concept refers to how the percent change of the response (dependent) variable relates to one percent of the predictor (independent) variable. Another benefit of using log transformations for all the variables is not having to face issues of inverse data transformations, like the ones faced by Son et al ( 8 ). For example, Equation 3 shows a log-log transformation equation used in the analyses.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Several studies have attempted to model the relationship between highway projects features and their durations in early stages (Nevett et al, 2021, Titirla and Aretoulis 2019, Son et al, 2019, Okere, 2019, Nani et al, 2017, Pesko et al, 2017. Pesko et al, (2017) concluded that integrating the estimation of duration and cost can compromise the significance of input data, leading to reduction of estimating accuracy compared to that based on separate estimation.…”
Section: Cost and Duration Estimationmentioning
confidence: 99%
“…Regression modeling is a form of predictive modeling that investigates the relationship between the dependent and variables. In construction engineering and management, regression modeling has been used to provide decision support insights for construction operations (Bowen et al, 2014;Son et al, 2019). In this research, regression modeling is used to model the scaffolding productivity from onsite operations.…”
Section: Productivity Regression Modellingmentioning
confidence: 99%