Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
7
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 25 publications
(9 citation statements)
references
References 45 publications
1
7
0
Order By: Relevance
“…Doganis and Sarimveis [101] solved the scheduling problem of a single yoghurt production line taking into account inventory, manpower and capacity restrictions. The model was tested using data from a yoghurt production line of a Greek dairy industry, where 18 products were produced and global optimum schedules have been generated in less than 15 s. The integrated planning and scheduling problem of a small size Balkan type semi-continuous yoghurt facility, with eight final product types, produced by three intermediates has also been investigated [102]. The evaluation of the proposed MILP approach has been utilized via a simulation model.…”
Section: Food Industriesmentioning
confidence: 99%
“…Doganis and Sarimveis [101] solved the scheduling problem of a single yoghurt production line taking into account inventory, manpower and capacity restrictions. The model was tested using data from a yoghurt production line of a Greek dairy industry, where 18 products were produced and global optimum schedules have been generated in less than 15 s. The integrated planning and scheduling problem of a small size Balkan type semi-continuous yoghurt facility, with eight final product types, produced by three intermediates has also been investigated [102]. The evaluation of the proposed MILP approach has been utilized via a simulation model.…”
Section: Food Industriesmentioning
confidence: 99%
“…The first approach focuses on the definition of the best process options either by optimizing production scheduling (i.e. time management) (Sel et al, 2017) by comparing multiple process scenarios on the basis of several criteria (Gésan-Guiziou et al, 2019;Depping et al, 2017Depping et al, , 2020. In these studies, the operating conditions and process design of each unit operations, combined in the overall process, have been considered as constant.…”
Section: Introductionmentioning
confidence: 99%
“…Although general scheduling problems with uncertainty have been considered by several authors (Lusa et al, 2008;Galetakis et al, 2012;El Amraoui and Mesghouni, 2014;Hu and Hu, 2016;Kenan et al, 2017;Sel et al, 2017), there has been limited work on HEN cleaning scheduling under uncertainty. A search through the literature found a few publications, such as Bagajewicz (2004a, 2005).…”
Section: Introductionmentioning
confidence: 99%