Construction Research Congress 2018 2018
DOI: 10.1061/9780784481264.024
|View full text |Cite
|
Sign up to set email alerts
|

Planning and Control Framework for Virtual Design and Construction: Case-Based Evidence from Electrical Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…Santos and Ferreira have studied productivity comparing 2D and 3D BIM coordination [21]. Cost-benefit analysis of BIM-enabled design clash detection and resolution was conducted in [22], while Said and Reginato [23] analyzed the time spent on BIM design-related activities for professions and especially electrical designers. Duration of incorporation of BIM project changes required by the client and the so-called "Change Ripple Effect" (a chain reaction where one change affects other results in a row that also need to be changed) was evaluated by Moayeri et al [24].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Santos and Ferreira have studied productivity comparing 2D and 3D BIM coordination [21]. Cost-benefit analysis of BIM-enabled design clash detection and resolution was conducted in [22], while Said and Reginato [23] analyzed the time spent on BIM design-related activities for professions and especially electrical designers. Duration of incorporation of BIM project changes required by the client and the so-called "Change Ripple Effect" (a chain reaction where one change affects other results in a row that also need to be changed) was evaluated by Moayeri et al [24].…”
Section: Literature Reviewmentioning
confidence: 99%