Pumping Station Design 2008
DOI: 10.1016/b978-185617513-5.50011-1
|View full text |Cite
|
Sign up to set email alerts
|

Piping

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…That cubes with dimensions (150 mm x 150 mm x 150 mm) were coated with diacryodides resin paste of different thicknesses: 300 m, 250 m150 m. The reinforced concrete cubes were exposed after 28 days of curing to a corrosive environment for 60 days, in order to stimulate accelerated corrosion of rebar. Another test was performed using reinforced concrete cubes, in which the steel was not coated with dacryodidesoles resin but was also exposed after 28 days of curing to the same corrosive environment for 60 days [16]. Bonding strength test results of failure bonding load, bonding strength and maximum slip were 21.30%, 36.80% and 32.00% for members corroded, 36.47%, 64.00% and 49.30% for members coated respectively.…”
Section: Literature Reviewmentioning
confidence: 99%
“…That cubes with dimensions (150 mm x 150 mm x 150 mm) were coated with diacryodides resin paste of different thicknesses: 300 m, 250 m150 m. The reinforced concrete cubes were exposed after 28 days of curing to a corrosive environment for 60 days, in order to stimulate accelerated corrosion of rebar. Another test was performed using reinforced concrete cubes, in which the steel was not coated with dacryodidesoles resin but was also exposed after 28 days of curing to the same corrosive environment for 60 days [16]. Bonding strength test results of failure bonding load, bonding strength and maximum slip were 21.30%, 36.80% and 32.00% for members corroded, 36.47%, 64.00% and 49.30% for members coated respectively.…”
Section: Literature Reviewmentioning
confidence: 99%