Pilgrim Station Steam Separator Lifting Lug Material Evaluation and Analysis

Abstract: During Refueling Outage 18 (RFO18, April 2011) Pilgrim Nuclear Power Station (PNPS) identified crack-like indications on the Steam Separator Lifting Lugs. A multi-disciplinary engineering effort was undertaken to determine the cause of the cracking and prepare the technical justification for long term operation of the lifting lugs. This approach focused on addressing the potential for future degradation due to the existing indications, and the resulting effects on the hardware and its function. A materials eva… Show more