2011
DOI: 10.1088/0029-5515/51/6/063004
|View full text |Cite
|
Sign up to set email alerts
|

Physics and engineering design of the accelerator and electron dump for SPIDER

Abstract: The ITER Neutral Beam Test Facility (PRIMA) is planned to be built at Consorzio RFX (Padova, Italy). PRIMA includes two experimental devices: a full size ion source with low voltage extraction called SPIDER and a full size neutral beam injector at full beam power called MITICA. SPIDER is the first experimental device to be built and operated, aiming at testing the extraction of a negative ion beam (made of H − and in a later stage D − ions) from an ITER size ion source. The main requirements of this experiment… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
61
0

Year Published

2011
2011
2019
2019

Publication Types

Select...
6
2

Relationship

4
4

Authors

Journals

citations
Cited by 87 publications
(62 citation statements)
references
References 47 publications
(69 reference statements)
1
61
0
Order By: Relevance
“…4 shows the model, which reproduces the geometry described in Ref. [2]. The domain sizes are 22 Â 22 Â 105 mm, and Kn ¼ 3 ÷ 6 is calculated within this flow region.…”
Section: Single-beamlet Simulation Of Spidermentioning
confidence: 89%
See 1 more Smart Citation
“…4 shows the model, which reproduces the geometry described in Ref. [2]. The domain sizes are 22 Â 22 Â 105 mm, and Kn ¼ 3 ÷ 6 is calculated within this flow region.…”
Section: Single-beamlet Simulation Of Spidermentioning
confidence: 89%
“…SPIDER is presently under construction, and the experimental activities are expected to start in 2016. The SPIDER accelerator was designed to satisfy the physics and engineering requirements of the ITER Heating Neutral Beam Injector [2]: an extracted current density greater than 355/285 A m À2 for H À /D À ions respectively, an ion beam energy of 100 keV, and a pulse duration up to 3600 s. As shown in Fig. 1, the SPIDER Beam Source (BS) is contained in a Vacuum Vessel (VV), which contains also a beam dump and a diagnostic calorimeter to stop the ion beam.…”
Section: Introductionmentioning
confidence: 99%
“…Negative ion sources [1,2,3] are a fundamental component of Neutral Beam Injectors (NBI) [4,5,6,7,8,9], which contribute most of the additional plasma heating and current drive to the International Tokamak Experimental Reactor (ITER) project and which need to be strongly optimized in the perspective of the more demanding DEMO reactor [10]. A relatively compact radiofrequency (rf) ion source, named NIO1 (Negative Ion Optimization phase 1) is being developed and tested in Padua, Italy, in collaboration bewteen Consorzio RFX and INFN [11], in the framework of the accompanying activities in support to the ITER NBI test facility and to the Megavolt ITer Injector Concept Advancement (MITICA) [8], to provide a test bench for source optimizations.…”
Section: Introductionmentioning
confidence: 99%
“…In the framework of the support activities for the ITER NBIs, the PRIMA test facility, which includes a RF-driven source with 100 keV accelerator (SPIDER) and a complete 1 MeV Neutral Beam system (MITICA), is under construction at Consorzio RFX in Padova [6,7].…”
Section: Introductionmentioning
confidence: 99%