2020
DOI: 10.1049/iet-rpg.2019.1172
|View full text |Cite
|
Sign up to set email alerts
|

Photovoltaic power plants in electrical distribution networks: a review on their impact and solutions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
16
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 26 publications
(19 citation statements)
references
References 114 publications
(126 reference statements)
0
16
0
Order By: Relevance
“…Current energy schemes are not intended to care for large-scale amalgamation of photovoltaic energy, and respond to grid codes (Mansouri, Lashab, Guerrero and Cherif, 2020). The bid of able and online control methods, is very important for improved coordination between the various parts of modern electrical systems (Mansouri et al, 2020;Chihota, 2019). In grid-connected mode, collaborative energy management is where microgrid participants can cooperate and use resources effectively (Oladejo, 2018).…”
Section: Distribution Managementmentioning
confidence: 99%
“…Current energy schemes are not intended to care for large-scale amalgamation of photovoltaic energy, and respond to grid codes (Mansouri, Lashab, Guerrero and Cherif, 2020). The bid of able and online control methods, is very important for improved coordination between the various parts of modern electrical systems (Mansouri et al, 2020;Chihota, 2019). In grid-connected mode, collaborative energy management is where microgrid participants can cooperate and use resources effectively (Oladejo, 2018).…”
Section: Distribution Managementmentioning
confidence: 99%
“…The proposed control strategy is a model-based algorithm, and its efficiency depends on the model fidelity. This paper uses an empirically validated PV array model [8], where the author fitted the experimental data to the model. We assume using perfect sensors and a good estimation of model parameters.…”
Section: Scenario 4 Model Parameters Estimationmentioning
confidence: 99%
“…Lately, such a standard was modified to accommodate a high penetration of distributed resources, including PV generators, to play an essential role in frequency and voltage control. Besides, grid operators modified grid code to harness ancillary services imposed on PV plant operators to respond to the sudden change in grid frequency [8]. Recently, many research efforts have been made to find practical solutions to tackle the incorporation of large-scale PV system problems.…”
mentioning
confidence: 99%
“…In this experiment, the authors conducted tests by varying irradiance and wind speed levels without knowing the actual weather conditions. The authors in [22] also reviewed the effects of PV integration on both active and reactive powers. They have also discussed the curtailment of active power during over-voltages and reactive power management during low voltage conditions and suggested PV forecasting for voltage stability management.…”
Section: Literature Surveymentioning
confidence: 99%