Photovoltaic Inverter Profiles in Relation to the European Network Code NC RfG and the Requirements of Polish Distribution System Operators

Abstract: The presently observed rapid increase in photovoltaic (PV) micro-installation connections to low-voltage networks, resulting from numerous financial support programmes, European Union (EU) energy policy and growing social awareness of environmental and economic issues, raise the question if PV inverters widely available in EU market fulfil the numerous technical requirements specified in European and Polish regulations. The paper presents the results of an experimental study carried out on three PV Inverters w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 6 publications
(8 citation statements)
references
References 16 publications
0
8
0
Order By: Relevance
“…Islanding detection methods (IDMs) can be classified into remote, local, and intelligent methods [2,3]. The conventional IDMs are defined as passive, active, and hybrid methods.…”
Section: Conventional Islanding Detection Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…Islanding detection methods (IDMs) can be classified into remote, local, and intelligent methods [2,3]. The conventional IDMs are defined as passive, active, and hybrid methods.…”
Section: Conventional Islanding Detection Methodsmentioning
confidence: 99%
“…(2) The total capacity of the power generation plants connected to the distribution system with the LV level must not exceed 30% of the connected distribution transformer power. (3) The stiffness ratio is defined as the rate of the short circuit current of the distribution system/the nominal current of the distribution network. It must be over 30 for the co-generation plants that the installed power is over 1 MWp, and it must be over 70 for other power generation plants [41,42].…”
Section: Grid Connection Rules Of Unlicensed Pv Power Plants In Turkeymentioning
confidence: 99%
See 3 more Smart Citations