2020
DOI: 10.1109/access.2020.3043338
|View full text |Cite
|
Sign up to set email alerts
|

Phased-Array Radar Task Scheduling Method for Hypersonic-Glide Vehicles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
9
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(9 citation statements)
references
References 18 publications
0
9
0
Order By: Relevance
“…Assuming that the cross-sectional area of HGV is 0.01 m 2 , and the false alarm probability is 10 −6 , the following two benchmark models are selected for comparison. The first model is a radar task scheduling algorithm based on the particle swarm-annealing algorithm proposed by Meng and Tian [32], which is marked as Method 1. The second model is a sensor network deployment optimisation algorithm based on modified differential evolution proposed by Cao et al [33], which is marked as Method 2.…”
Section: Simulationmentioning
confidence: 99%
“…Assuming that the cross-sectional area of HGV is 0.01 m 2 , and the false alarm probability is 10 −6 , the following two benchmark models are selected for comparison. The first model is a radar task scheduling algorithm based on the particle swarm-annealing algorithm proposed by Meng and Tian [32], which is marked as Method 1. The second model is a sensor network deployment optimisation algorithm based on modified differential evolution proposed by Cao et al [33], which is marked as Method 2.…”
Section: Simulationmentioning
confidence: 99%
“…HGV is an aircraft with a speed above Mach 5 and flying in near space [1]. Compared with a conventional ballistic missile, HGV has stronger maneuverability and can strike any target in the world within two hours [2]. It has changed the traditional combat style and has significant military application value, which has attracted the great attention of various countries [3,4].…”
Section: Introductionmentioning
confidence: 99%
“…The adaptive dwell scheduling algorithms can be further divided into the ones based on the heuristic method [5][6][7][8][9][10][11][12][13][14] and the ones based on the intelligent method [15][16][17][18][19][20][21][22][23][24][25][26][27]. A dwell scheduling algorithm based on time pointer is proposed in ref.…”
Section: Introductionmentioning
confidence: 99%
“…All the dwell scheduling algorithms based on the intelligent algorithm in refs. [15][16][17][18][19][20][21][22][23][24][25] treat dwell tasks as nonpreemptive tasks. In ref.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation