2020
DOI: 10.1016/j.measurement.2019.107244
|View full text |Cite
|
Sign up to set email alerts
|

Performance prediction of tunnel boring machine through developing high accuracy equations: A case study in adverse geological condition

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 24 publications
(7 citation statements)
references
References 37 publications
0
7
0
Order By: Relevance
“…One of the essential tasks in the excavation of tunnels with TBMs is the reliable estimation of the performance needed for planning, cost control and other decisionmaking regarding the feasibility of tunnelling projects [2]. However, according to results of the extensive review on the literature performed by Samaei et al [49], there is no comprehensive agreement on the quantitative or qualitative influence of various variables on the TBM performance assessment, but the degree of accuracy in its prediction has been improved in recent years through using various algorithms such as ANN, support vector machine, fuzzy and neuro-fuzzy. For this reason, reliable prediction models for ROP have been attractive subjects for tunnel engineers.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…One of the essential tasks in the excavation of tunnels with TBMs is the reliable estimation of the performance needed for planning, cost control and other decisionmaking regarding the feasibility of tunnelling projects [2]. However, according to results of the extensive review on the literature performed by Samaei et al [49], there is no comprehensive agreement on the quantitative or qualitative influence of various variables on the TBM performance assessment, but the degree of accuracy in its prediction has been improved in recent years through using various algorithms such as ANN, support vector machine, fuzzy and neuro-fuzzy. For this reason, reliable prediction models for ROP have been attractive subjects for tunnel engineers.…”
Section: Resultsmentioning
confidence: 99%
“…A reliable and accurate prediction of the tunnel boring machine (TBM) performance can assist in minimizing the relevant risks of high capital costs and in scheduling tunnelling projects [68,69]. With respect to TBM drilling in hard rocks, the most important aspect of its operation is the prediction of its rate of penetration (ROP) [49]. However, predicting the tunnel construction duration for long tunnels in complex geological and geotechnical conditions is not an easy task because of high uncertainty.…”
Section: Introductionmentioning
confidence: 99%
“…Farrokh et al (2012Farrokh et al ( , 2020, Hassanpour et al (2011), andMichael et al (2000), established correlation models between different rock mass parameters, such as uniaxial compression strength and joint spacing, and tunneling parameters using a large number of engineering data. Samaei et al (2020), Koopialipoor et al (2020), ), Feng et al (2021 2021) developed a step-by-step intelligent decision support system, prioritize the tunneling rate and work safety pressure to obtain the optimal score of TBM operation performance. Guo et al (2022) proposed a TBM assisted driving method that can automatically determine the optimal tunneling parameters of TBM under different rock grades and excavatability grades based on the classification of surrounding rock grades based on random forests.…”
Section: Introductionmentioning
confidence: 99%
“…Tunnel boring machines (TBMs) have been widely used in urban tunnel projects for roads, subways, and underground pipe corridors due to their high efficiency 1 3 . However, the complex and varied geological conditions could directly affect the tunneling efficiency of TBMs.…”
Section: Introductionmentioning
confidence: 99%