2016
DOI: 10.1117/12.2232099
|View full text |Cite
|
Sign up to set email alerts
|

Performance of the Gamma-ray Cherenkov Telescope structure: a dual-mirror telescope prototype proposed for the future Cherenkov Telescope Array

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
9
0

Year Published

2016
2016
2019
2019

Publication Types

Select...
4

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(9 citation statements)
references
References 2 publications
0
9
0
Order By: Relevance
“…The global geometry of the prototype mechanical structure equipped with metallic mirrors is found to be entirely compliant to the theoretical design, as shown by the experimental focal plan position, which is found within 1 mm of its theoretical value, and the on-axis plate scale of 39.57 mm/°, similar to the theoretical value of 39.6 mm/°. The stability of the structure and its experimental modal analysis (measured eigenmodes on the prototype) satisfies the normal modes specification and the optical displacement requirements [6,7,11]. The security systems and more especially the emergency stops have been tested several times during the different campaigns and the compliance tests, proving that the structure (and its pointing performance) suffer no damage.…”
Section: Mechanical and Control-command Performancementioning
confidence: 64%
“…The global geometry of the prototype mechanical structure equipped with metallic mirrors is found to be entirely compliant to the theoretical design, as shown by the experimental focal plan position, which is found within 1 mm of its theoretical value, and the on-axis plate scale of 39.57 mm/°, similar to the theoretical value of 39.6 mm/°. The stability of the structure and its experimental modal analysis (measured eigenmodes on the prototype) satisfies the normal modes specification and the optical displacement requirements [6,7,11]. The security systems and more especially the emergency stops have been tested several times during the different campaigns and the compliance tests, proving that the structure (and its pointing performance) suffer no damage.…”
Section: Mechanical and Control-command Performancementioning
confidence: 64%
“…The verification of the design performances with respect to CTA requirements is ongoing. The mechanical structure has been fully validated [5,6] . The remaining work consists of consolidating the optical characterisation of the pGCT and software testing.…”
Section: Counterweightmentioning
confidence: 99%
“…In the following, the GCT prototype telescope performance as well as the latest campaign of observation in Meudon are briefly described. A further section focuses on the developments made in terms of design validation or integration during this last year from the project status reported in Dournaux et al [5].…”
mentioning
confidence: 99%
“…The final design of the telescope has a total mass of about 8 tons. The Telescope Control System's (TCS) main purpose is to drive the telescope's axes for tracking and pointing [5,9]. To achieve this, three embedded cabinets connected to a power supply and network (Internet and fieldbus) are implemented on the telescope.…”
mentioning
confidence: 99%
See 1 more Smart Citation