2019
DOI: 10.5130/ajceb.v19i2.6659
|View full text |Cite
|
Sign up to set email alerts
|

Performance of performance specifications in design-build highway projects

Abstract: Design-build contracts with performance-based specifications are believed to raise productivity and the innovation rate. Such specifications for highway and bridge contracts may create risks, be too detailed or difficult to verify. The purpose has been to analyse how performance-based requirements are used in Swedish design-build contracts for highway projects. How contractors are encouraged to provide innovative technologies is emphasized. Generic documents from the Swedish Transport Administration for design… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 29 publications
0
5
0
Order By: Relevance
“…The ex ante steering identified in the empirical data has a direct effect on the innovation possibilities for contractors. If the client procures a DB contract with detailed demands (Bröchner and Silfwerbrand, 2019), there is not much room for change by the contractor during design and execution. However, functional demands could still be hindered by rules and regulations that are decided by the central organization, even if the client has chosen an output control system in the project (Eriksson, 2006).…”
Section: Discussionmentioning
confidence: 99%
See 4 more Smart Citations
“…The ex ante steering identified in the empirical data has a direct effect on the innovation possibilities for contractors. If the client procures a DB contract with detailed demands (Bröchner and Silfwerbrand, 2019), there is not much room for change by the contractor during design and execution. However, functional demands could still be hindered by rules and regulations that are decided by the central organization, even if the client has chosen an output control system in the project (Eriksson, 2006).…”
Section: Discussionmentioning
confidence: 99%
“…Detailed demands ( process control) seem to reduce the potential for innovation, confirming the studies conducted by Gann et al (1998) and Bröchner and Silfwerbrand (2019). The empirical data from both the client and the contractors indicates that process control has the most negative impact of the three control systems, on innovation possibilities.…”
Section: Discussionmentioning
confidence: 99%
See 3 more Smart Citations