2019 4th International Conference on Smart and Sustainable Technologies (SpliTech) 2019
DOI: 10.23919/splitech.2019.8783046
|View full text |Cite
|
Sign up to set email alerts
|

Performance Assessment of Building Integrated Photovoltaic and Battery Energy System: A Case Study of TERI-Retreat Facilty in India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
2
1

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…TERI Retreat Building, India The annual average PV and grid contribution to meet the load demand is estimated to be 53% and 47% respectively 12.8 kWp Sharma et al (2019) 21 Jaen University…”
mentioning
confidence: 99%
“…TERI Retreat Building, India The annual average PV and grid contribution to meet the load demand is estimated to be 53% and 47% respectively 12.8 kWp Sharma et al (2019) 21 Jaen University…”
mentioning
confidence: 99%