Perceptions of architectural design and project risk: understanding the architects' role in a PPP project

Abstract: Southern Cross Station is one of the largest public-private partnership (PPP) projects undertaken in Australia. In this project the architects played a significant role in developing an iconic design which has received international professional design awards and much media attention. In the media the architects' design was perceived as having impacted negatively on capital costs. Given these contradictory perceptions, the aim of this study was to better understand perceptions of the architects' role in relati… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

2
16
0

Year Published

2009
2009
2017
2017

Publication Types

Select...
4
3

Relationship

1
6

Authors

Journals

citations
Cited by 19 publications
(18 citation statements)
references
References 30 publications
(23 reference statements)
2
16
0
Order By: Relevance
“…They may appear to be removed from project managers and the project realities of time and cost outcomes. In the Australian media when problems arise during PPP construction processes it is the design which is often reported as a significant risk factor (Raisbeck, 2008). This points to the common misunderstandings between designers, project managers and contractors regarding the factors critical to successful design development.…”
Section: Introductionmentioning
confidence: 98%
See 1 more Smart Citation
“…They may appear to be removed from project managers and the project realities of time and cost outcomes. In the Australian media when problems arise during PPP construction processes it is the design which is often reported as a significant risk factor (Raisbeck, 2008). This points to the common misunderstandings between designers, project managers and contractors regarding the factors critical to successful design development.…”
Section: Introductionmentioning
confidence: 98%
“…The hierarchy is Design development 21 structured using categories adapted from innovation theory alongside criteria and sub-criteria developed in previous research (Raisbeck, 2008). The hierarchy distinguishes between exploratory and exploitative notions of design development.…”
Section: Introductionmentioning
confidence: 99%
“…The criteria for prequalification in relation to the contractor's ability to meet the client's requirements and achieve success in projects are still a topic for investigation [9] [10]. Contrastingly, the lowest bid price is a highly weighted criterion, yet it is a prime cause of problem for selection of contractors in most works [11] [12]. Growth of public-private partnerships (PPP) in many countries including Australia, India etc.…”
Section: Introductionmentioning
confidence: 99%
“…In fact, PPP related research has been growing even more recently (Tang, et al, 2010). These research topics in PPP include: analytical frameworks for PPPs (Ozdoganm and Birgonul, 2000;Carillo et al, 2006), critical success factors (Li et al, 2005;Tabish and Jha, 2011), contractual arrangements and structures of PPP/PFIs Ahadzi and Bowles, 2004;Chowdhury et al, 2011), real options (Liu and Cheah, 2009;Shan et al, 2010), value for money (Akintoye et al, 2003;Henjewele et al, 2011), and even architectural design (Leiringer, 2006;Raisbeck, 2008).…”
Section: Introductionmentioning
confidence: 99%