2017
DOI: 10.1016/j.autcon.2016.09.003
|View full text |Cite
|
Sign up to set email alerts
|

Perceiving safety risk of buildings adjacent to tunneling excavation: An information fusion approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
55
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 120 publications
(55 citation statements)
references
References 54 publications
0
55
0
Order By: Relevance
“…In step 3, the aggregated SVNSs, the aggregated PIS and NIS are obtained. Then the distance for each aggregated SVNS between A * a and between A − * a can be calculated by Euclid distance Equation (8). The distance between A a j and A * a is calculated as follows:…”
Section: An Improved Multi-criteria Decision Making Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…In step 3, the aggregated SVNSs, the aggregated PIS and NIS are obtained. Then the distance for each aggregated SVNS between A * a and between A − * a can be calculated by Euclid distance Equation (8). The distance between A a j and A * a is calculated as follows:…”
Section: An Improved Multi-criteria Decision Making Methodsmentioning
confidence: 99%
“…With the rapid development of human society, the social environment has become more and more complex, which makes us have difficulties in making actual decision [1][2][3][4][5][6][7][8][9]. Therefore, in recent years, more and more attention has been paid to multi-attribute decision making [10][11][12][13][14][15][16].…”
Section: Introductionmentioning
confidence: 99%
“…The Dempster-Shafer theory is an effective tool to express uncertainty information and make information fusion. [20][21][22][23] The research related to the Dempster-Shafer theory 1,2 has attracted much interest, including uncertainty measure, 24,25 evidential network, 26,27 evidence combination, [28][29][30] conflict management, 31,32 likelihood function, 33,34 and so on. [35][36][37] On the basis of the Dempster-Shafer theory, many new models handling uncertainty information have also been proposed, like D numbers.…”
Section: Dempster-shafer Evidence Theorymentioning
confidence: 99%
“…At present, domestic and foreign scholars have proposed many methods for equipment fault diagnosis, including qualitative analysis-based method, 3,4 modelbased method, 5,6 data-driven-based method, [7][8][9][10] and so on. The qualitative analysis-based method, which analyzes the causality and development law of equipment failure, needs to rely on some qualitative analysis tools and combine with expert knowledge and system knowledge to carry out knowledge reasoning, including graph theory methods, 11 expert systems, [12][13][14] qualitative simulation, 15 and so on.…”
Section: Introductionmentioning
confidence: 99%