2022
DOI: 10.21608/jicem.2022.136081.1002
|View full text |Cite
|
Sign up to set email alerts
|

Perceived barriers for early mobilization of patients admitted to the intensive care unit (ICU)

Abstract: Conclusion:Early mobilization protocols can be implemented in ICUs after adequate addressing of potential barriers that can face healthcare workers, prepare the ICU environment with equipment and trained personnel.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

1
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 18 publications
1
1
0
Order By: Relevance
“…[41] Staff limitations, time constraints, insu cient planning and coordination, and inadequate staff training were among other challenges identi ed. [42] Our study data aligns with from the UK, highlighting physiological instability, insu cient sta ng, required sedation, lack of resources and equipment, failure to recognize patient readiness, and limited funds as key impediments. [35]Additionally, the patient's medical condition, potential dislodgment of devices, and the presence of an endotracheal tube were reported barriers from a Canadian perspective.…”
Section: Discussionsupporting
confidence: 75%
“…[41] Staff limitations, time constraints, insu cient planning and coordination, and inadequate staff training were among other challenges identi ed. [42] Our study data aligns with from the UK, highlighting physiological instability, insu cient sta ng, required sedation, lack of resources and equipment, failure to recognize patient readiness, and limited funds as key impediments. [35]Additionally, the patient's medical condition, potential dislodgment of devices, and the presence of an endotracheal tube were reported barriers from a Canadian perspective.…”
Section: Discussionsupporting
confidence: 75%
“…This list was enlarged by Nardo et al (2021) to include disease severity, medical orders, human resources, and the availability of mobilization equipment [ 18 ]. Staffing difficulties, time constraints, inadequate planning and coordination, and a lack of staff training were also mentioned [ 31 ]. Our research aligns with Thompson et al’s findings in the UK.…”
Section: Discussionmentioning
confidence: 99%