2018
DOI: 10.5604/01.3001.0013.7351
|View full text |Cite
|
Sign up to set email alerts
|

Passage control for ERTMS/ETCS level 2 implementation on railway lines with mix traffic

Abstract: Currently the ERTMS/ETCS level 2 system is implemented on the polish railway lines. On all railway lines where this system is implemented (or will be implemented in near future) there is a mix traffic. It means that both equipped and unequipped with ETCS system trains shall be considered from command and control system point of view. This article presents issue related to the function of passage control in the system and its proper design for fulfill availability and safety requirements for mix traffic signali… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles