8th International Conference on Advances in Power System Control, Operation and Management (APSCOM 2009) 2009
DOI: 10.1049/cp.2009.1745
|View full text |Cite
|
Sign up to set email alerts
|

Partial discharge monitoring system for CLP power strategic 400 kV GIS extension at black point power station

Abstract: CLP Power Hong Kong Limited (CLP Power) has reinforced its 400kV power grid by introducing new extension switchgear to the Black Point Power Station (BKP). Since the circuits are of strategic importance to provide more generation infeed capacity and any fault must be avoided by all means, if possible, to ensure high supply reliability, CLP Power has created a cooperative arrangement with Mitsubishi Electric, the original equipment manufacturer of the 400kV gas insulated switchgear (GIS) for BKP to establish an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 2 publications
(2 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?