2014
DOI: 10.1016/j.egypro.2014.07.024
|View full text |Cite
|
Sign up to set email alerts
|

Part Load Behaviour of Power Plants with a Retrofitted Post-combustion CO2 Capture Process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
7
0
1

Year Published

2016
2016
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 3 publications
1
7
0
1
Order By: Relevance
“…Only the lean loadings at regular part load operation at 40% and 50% GT load drop slightly compared to the design value. This is line with Roeder and Kather (2014) and Oh and Kim (2018) and a consequence of the changing reboiler and desorber conditions. Rich loading across all GT loads and part load strategies remains unchanged.…”
Section: Solvent Loadings and L/g Ratiosupporting
confidence: 82%
See 1 more Smart Citation
“…Only the lean loadings at regular part load operation at 40% and 50% GT load drop slightly compared to the design value. This is line with Roeder and Kather (2014) and Oh and Kim (2018) and a consequence of the changing reboiler and desorber conditions. Rich loading across all GT loads and part load strategies remains unchanged.…”
Section: Solvent Loadings and L/g Ratiosupporting
confidence: 82%
“…The approach taken in this study for optimally controlling the capture plant at regular part load operation (i.e. no additional regeneration of stored rich solvent) is consequently based on Oh and Kim (2018) and Roeder and Kather (2014). Effectively, reboiler temperature is governed by decreasing steam pressures and saturation temperatures at part load on the steam side of the reboiler and by the heat requirements on the solvent side of the reboiler.…”
Section: Part Load Strategymentioning
confidence: 99%
“…Saat ini kendala utama dari teknologi ini adalah kebutuhan energi yang sangat tinggi terutama pada proses regenerasi Amine (Elias et al, 2018). Roeder dkk membuat model PLTU batubara 600 MW dan simulasi absorbsi kimia dengan MEA (Roeder & Kather, 2014). Hasilnya menunjukan bahwa efisiensi pembangkit turun 10.7% pada beban 100%.…”
Section: Absorbsi Kimiaunclassified
“…Such calculations for the UK power network require the efficiency of each generator type to determine fuel consumptions and corresponding carbon amount, but the efficiency of each generator is not a fixed figure. For instance, the part-load efficiency of thermal power plants is often lower than its rating value (Roeder and Kather, 2014). Secondly, in the UK, there is imported electricity from other countries, e.g., France and Ireland, whose emission factors are difficult to calculate at high temporal resolution, i.e., half-hourly level or daily level (Cleary et al, 2016) .…”
Section: Supplemental Informationmentioning
confidence: 99%