Engineering and Mining Geophysics 2019 15th Conference and Exhibition 2019
DOI: 10.3997/2214-4609.201901705
|View full text |Cite
|
Sign up to set email alerts
|

Parametric Decoding and Approximated Estimations in Engineering Geophysics with the Localization of Seismic Risk Zones on the Example of Northern Part of Kola Peninsula

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
14
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(15 citation statements)
references
References 0 publications
0
14
0
Order By: Relevance
“…When implementing a diversification strategy, a hotel business has the possibility to reallocate resources, thereby withstand the most difficult economic conditions, increase the effectiveness of using existing labour potential, ensure full occupancy of hotel rooms, adapt to the rapidly changing market conditions, actively withstand competitors, including buying their businesses, attracting their customers, reducing dependence on partners [57][58][59][60][61][62][63][64][65][66][67][68][69].…”
Section: Resultsmentioning
confidence: 99%
“…When implementing a diversification strategy, a hotel business has the possibility to reallocate resources, thereby withstand the most difficult economic conditions, increase the effectiveness of using existing labour potential, ensure full occupancy of hotel rooms, adapt to the rapidly changing market conditions, actively withstand competitors, including buying their businesses, attracting their customers, reducing dependence on partners [57][58][59][60][61][62][63][64][65][66][67][68][69].…”
Section: Resultsmentioning
confidence: 99%
“…According to the latest results of modeling the effects of climate change [62][63][64][65][66][67][68][69], obtained by scientists of the Institute of Atmospheric Physics them. A.M. Obukhov RAS, although the ensemble of models in the XXI century.…”
Section: Discussionmentioning
confidence: 99%
“…( a ) Position of the Blackpool peninsula relative to the generalized tectonic scheme [25]. ( b ) Location of the Blackpool peninsula on the Paleogeographic Scheme, Northwest of England and North Wales [30]. ( c ) A structural image of the vertical section along the sub-expansion profile that splits in the first third of the Bowland Basin site.…”
Section: Geological Position Of the Regionmentioning
confidence: 99%
“…For the same object, the remote images, on the one hand, and the analysis of geophysical fields, on the other, can be used to mutually verify each other. Here, a unified authors' method [30,31] of recalculating scalar geofields (magnetic and gravimetric) in the field of linear structures can be summarized as follows: For a given scalar field in the ( x , y ) plane and the modulus of its gradient, the matrices of grid values are constructed.It is followed by the use of the appropriate autocorrelation function and evaluation of the autocorrelation radius in the ( x , y ) plane.The orientation of local principal axes is determined with reference to the extrema of the scalar geofield and relative to the maxima of the modulus of its gradient.Following the cubic spline approximation linked to a local rotation of principal axes and minimization of the mean square deviation for the given scalar geofield, the geostructural lines of the first order and geostructural approximations of the second order are constructed. The third-order trend is displayed as a smooth image of a geostructural line.In terms of formal verification of the positions of discordant structures, a re-calculation of the scalar geofield is applied in a sliding cruciform window, formed as two mutually orthogonal rectangles.…”
Section: Primary Data and Algorithmic Foundation Used In The Interpre...mentioning
confidence: 99%