2000
DOI: 10.1061/(asce)0887-3801(2000)14:4(233)
|View full text |Cite
|
Sign up to set email alerts
|

Parametric Coordinator for Engineering Design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2001
2001
2016
2016

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 24 publications
0
1
0
Order By: Relevance
“…Thus, it requires a high level of cooperation and coordination among project team throughout the construction processes (Adedeji, 2008), so that a higher degree of operational efficiency can be achieved for a project (Hassoin, 2009). Soh and Wang (2000) concur that a high level of coordination is a prerequisite among all the project teams, from office to the construction site until the project is completed. Nevertheless, the level of coordination in construction project is found to be difficult to assess.…”
Section: Journal Of Organizational Management Studiesmentioning
confidence: 99%
“…Thus, it requires a high level of cooperation and coordination among project team throughout the construction processes (Adedeji, 2008), so that a higher degree of operational efficiency can be achieved for a project (Hassoin, 2009). Soh and Wang (2000) concur that a high level of coordination is a prerequisite among all the project teams, from office to the construction site until the project is completed. Nevertheless, the level of coordination in construction project is found to be difficult to assess.…”
Section: Journal Of Organizational Management Studiesmentioning
confidence: 99%