Supply Chain 2008
DOI: 10.5772/5346
|View full text |Cite
|
Sign up to set email alerts
|

Parameterization of MRP for Supply Planning Under Lead Time Uncertainties

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2010
2010
2016
2016

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 29 publications
0
2
0
Order By: Relevance
“…In real life situation, the deterministic assumptions embedded in MRP are often too limited [2]. Lead time is a very vital parameter in production and inventory costs.…”
Section: Introductionmentioning
confidence: 99%
“…In real life situation, the deterministic assumptions embedded in MRP are often too limited [2]. Lead time is a very vital parameter in production and inventory costs.…”
Section: Introductionmentioning
confidence: 99%
“…Molinder (1997) showed that both the uncertainty of the lead time and demand variability involve the level of optimal safety lead times and optimal safety stocks. Dolgui et al (2008) studied the MRP parameterization problem for two-level assembly systems with random component procurement times. They explained that lead time uncertainties seem to be insufficiently studied for a long time, favouring the study of demand uncertainties.…”
Section: Introduction and Related Publicationsmentioning
confidence: 99%