2020
DOI: 10.1155/2020/1381340
|View full text |Cite
|
Sign up to set email alerts
|

Parallel Machine Production and Transportation Operations’ Scheduling with Tight Time Windows

Abstract: This study addresses a parallel machine production and transportation operations’ scheduling problem with a tight time window associated with the transfer and delivery process. The orders located at the parallel machines need to be delivered to customers by train. Each order must be processed within a limited completion time in order for the product to be matched with the optimal trip to its destination within the delivery period. A mathematical analysis method is used to reveal the impact of tight time window… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 55 publications
(66 reference statements)
0
0
0
Order By: Relevance