Proceedings of the Fourth International Symposium on Block and Sublevel Caving 2018
DOI: 10.36487/acg_rep/1815_04_diering
|View full text |Cite
|
Sign up to set email alerts
|

Palabora Lift 1 block cave: understanding the grade behaviour

Abstract: Palabora Mining Company commenced mining of the Lift 1 block cave in 2001. Lift 1 is now nearing completion, and this paper will discuss the challenges around the reconciliation and forecasting of grades during the life of Lift 1. Particular emphasis will be placed on the impact of the open pit failure which took place in 2004 and its impact on the grades later on in Lift 1. The paper will look at the different caving mechanisms which have contributed to, and impacted on, the recovered metal from the block cav… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…Fortunately, changes to mixing (dilution) parameters only have marginal impacts on reserves, particularly for orebodies with heights of draw >500 m. A significant change in grade behaviour is not observed during the early stages of draw i.e "if we mixed high grade material with similar high grade material we still end up with high grade material" (Diering et al 2018). In general, the uniform distribution of mineralisation provides a predictable forecast for ore recovery, especially during the first half of a drawpoints production period.…”
Section: Drawpoint Spacingmentioning
confidence: 99%
“…Fortunately, changes to mixing (dilution) parameters only have marginal impacts on reserves, particularly for orebodies with heights of draw >500 m. A significant change in grade behaviour is not observed during the early stages of draw i.e "if we mixed high grade material with similar high grade material we still end up with high grade material" (Diering et al 2018). In general, the uniform distribution of mineralisation provides a predictable forecast for ore recovery, especially during the first half of a drawpoints production period.…”
Section: Drawpoint Spacingmentioning
confidence: 99%
“…The model is built mainly to predict the cave front in caving operations. PCSLC model (Diering 2007) 6/10 The model does not incorporate grade monitoring and assumes ore left on above level will be recovered on below levels conclusively but the literature shows a more chaotic flow.…”
Section: Case Study Minesmentioning
confidence: 99%
“…This leads to lower recoveries, with more fines and dilution. The study by Diering et al, (2018) suggest various factors that contribute to such a high content of dolerite, which leads to fines accumulating in the drawpoint much quicker. This challenge requires selective mining, which is difficult to accomplish in block caving.…”
Section: Introductionmentioning
confidence: 99%
“…Grade performance is influenced by various factors, which may range from the underground block size, plant recoveries, loading strategies and market conditions dictating the drawing rates, as well as the size and distribution of the drawpoints, and waste or dolerite content (Diering et al, 2018). In this research study we intend to highlight some of the strategies to employ to optimize drawpoint loading.…”
Section: Introductionmentioning
confidence: 99%