2003
DOI: 10.1049/el:20030868
|View full text |Cite
|
Sign up to set email alerts
|

Packet delay analysis of IEEE 802.11 MAC protocol

Abstract: A new packet delay analysis for the IEEE 802.11b protocol is developed by extending throughput analysis introduced by Bianchi. This analysis is validated by comparison with simulation results using the OPNET TM simulation package. Packet delay results are presented as a function of a number of stations and packet size for basic access and RTS=CTS medium access mechanisms. The proposed analysis identifies when the RTS=CTS mechanism achieves lower packet delay with respect to the basic access mechanism and becom… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
62
0
1

Year Published

2005
2005
2018
2018

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 114 publications
(65 citation statements)
references
References 3 publications
2
62
0
1
Order By: Relevance
“…Bianchi [7] defined a simple mathematical model of the DCF by modeling each node as a Markov Chain and considering the collision probability independent of the backoff stage. This analytical model has been further extended by several authors, for instance, in [8], the analysis is extended to compute the channel access delay. The Homeplug MAC has also been modeled following the Bianchi approach, the most well-know, although complex, analytical model is the one presented and validated in [9].…”
Section: Homeplug and Dcf Random Backoff Proceduresmentioning
confidence: 99%
See 3 more Smart Citations
“…Bianchi [7] defined a simple mathematical model of the DCF by modeling each node as a Markov Chain and considering the collision probability independent of the backoff stage. This analytical model has been further extended by several authors, for instance, in [8], the analysis is extended to compute the channel access delay. The Homeplug MAC has also been modeled following the Bianchi approach, the most well-know, although complex, analytical model is the one presented and validated in [9].…”
Section: Homeplug and Dcf Random Backoff Proceduresmentioning
confidence: 99%
“…To analytically model the k-ary exponential backoff is straightforward by using the Bianchi [7] and Chatzimisios et al [8] expressions and modifying W i to consider the new increase factor k. The new transmission probability (τ ) and average channel access delay (E[X]) can then be computed as shown in Eqs. 1 and 2, respectively.…”
Section: Dcf With K-ary Exponential Backoffmentioning
confidence: 99%
See 2 more Smart Citations
“…The second access mechanism is an optional four-way handshake technique (RTS-CTS-data-ACK) known as the request to send/clear to send (RTS/CTS) access method [2]. Many analytical models have been produced on the 802.11 MAC layer, and most previous works have analyzed and estimated the delay and throughput of IEEE 802.11 in singlehop wireless networks [2][3][4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%