All Days 2014
DOI: 10.2118/171285-ms
|View full text |Cite
|
Sign up to set email alerts
|

Overview of Solids Transport Studies and Applications in Oil and Gas Industry – Experimental Work

Abstract: The transport of solids is encountered in well bore drilling, completion, intervention and production operations. It is affected by many variables and the complexity of the process presents challenges to the field engineer who is trying to determine how these parameters affect solids-transport even if only one of these variables is changed. Historically, solids-transport studies focused mainly on determining the minimum critical velocity to prevent the formation of a stationary debris bed in the wellbore annul… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
3
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 27 publications
(6 citation statements)
references
References 58 publications
0
3
0
Order By: Relevance
“…Modifying the drilling fluid flow at any rate may not be sufficient to satisfactorily disturb the deposited cuttings-bed. It is of utmost importance to reach, and if possible, exceed a critical flow rate and shear stress threshold for bed erosion [4,28]. Sometimes it is not possible to reach the ideally high flow rates due to borehole instability problems and limited surface equipment capabilities.…”
Section: Operational Factorsmentioning
confidence: 99%
“…Modifying the drilling fluid flow at any rate may not be sufficient to satisfactorily disturb the deposited cuttings-bed. It is of utmost importance to reach, and if possible, exceed a critical flow rate and shear stress threshold for bed erosion [4,28]. Sometimes it is not possible to reach the ideally high flow rates due to borehole instability problems and limited surface equipment capabilities.…”
Section: Operational Factorsmentioning
confidence: 99%
“…The accumulation of this type of cuttings can cause different well drilling along with well completion operational issues (such as the pipe stuck, excessive torque and drag, wellbore cleaning, lost circulation, additional costs, etc.) [4][5][6]. Additionally, cuttings can be removed effectively and efficiently in extended-reach wells by pumping fluid at a high flow rate [7].…”
Section: Introductionmentioning
confidence: 99%
“…In two comprehensive review articles, Li and Luft [5,6] summarized experimental studies and theoretical analyses of hole cleaning. Experiments have also shown that hole cleaning can be different in gauge open hole and inside casing [7].…”
Section: Introductionmentioning
confidence: 99%