2018
DOI: 10.1007/s12517-018-3391-z
|View full text |Cite
|
Sign up to set email alerts
|

Overview of goaf water hazards control in China coalmines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
10

Relationship

2
8

Authors

Journals

citations
Cited by 18 publications
(8 citation statements)
references
References 8 publications
0
7
0
Order By: Relevance
“…As shown in Figure 5, mining in coal seam 8 # could enable the fissure zone to channel gob-water into coal seam 7 # because water would seep through the fissures into the caving zone. In this scenario, the water flow is relatively less destructive (Liao 2015;Gui et al 2016c). However, if the caving zone channels the gob-water into coal seam 7 # , the flow rate would be higher through the gaps between rocks in the caving zone, maximizing flow velocity and volume, and generating high water pressure and strong kinetic energy, and thus causing extensive destruction.…”
Section: Iii: Water-inrush Via Fissure or Caving Zonesmentioning
confidence: 99%
“…As shown in Figure 5, mining in coal seam 8 # could enable the fissure zone to channel gob-water into coal seam 7 # because water would seep through the fissures into the caving zone. In this scenario, the water flow is relatively less destructive (Liao 2015;Gui et al 2016c). However, if the caving zone channels the gob-water into coal seam 7 # , the flow rate would be higher through the gaps between rocks in the caving zone, maximizing flow velocity and volume, and generating high water pressure and strong kinetic energy, and thus causing extensive destruction.…”
Section: Iii: Water-inrush Via Fissure or Caving Zonesmentioning
confidence: 99%
“…Grouting is a well-known approach to preventing water bursting in coal mines [1][2][3]. As it is a massive work for water grouting sealing in coal mines, pipe blockage is not allowed during the grouting processes whereas water grouting sealing is expected to be soon as possible, the strength of the hardened body is desired to be reasonable against stratum movement, and the contents of grouting materials are hoped to be of low cost and available nearby.…”
Section: Introductionmentioning
confidence: 99%
“…Wang and Zhang proposed a numerical simulation method for fracture propagation and closure under seepage stress coupling that was modeled using the extended finite element method based on the research background of fractures and voids [17]. Gui et al reported that the primary cause of karst water inrush was the coupling effect of mining stress and bottom seepage [18]. Yi, Xiao, Tan, Ferfera, Chen, and Sheng-Qi Yang et al conducted rock damage experiments on rocks of different lithologies and concluded that the permeability of rocks changes significantly after damage [19][20][21][22][23][24].…”
Section: Introductionmentioning
confidence: 99%