Overall availability assessment of HVDC VSC XLPE cable symmetrical monopolar configuration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 9 publications
0
3
0
Order By: Relevance
“…The two‐state model applies also for modelling each pole of a HVDC link. References [2, 10, 14, 15, 17] present data and models for the characterisation of the failure rate and MTTR for overhead HVDC line and for undersea/underground HVDC cable. The computation of failure rate of a HVDC pole and its MTTR must take into account failures along the line, DC protections, DC filters, and all component required for its operation.…”
Section: Hvdc Grid Modelling For Availability Assessmentmentioning
confidence: 99%
“…The two‐state model applies also for modelling each pole of a HVDC link. References [2, 10, 14, 15, 17] present data and models for the characterisation of the failure rate and MTTR for overhead HVDC line and for undersea/underground HVDC cable. The computation of failure rate of a HVDC pole and its MTTR must take into account failures along the line, DC protections, DC filters, and all component required for its operation.…”
Section: Hvdc Grid Modelling For Availability Assessmentmentioning
confidence: 99%
“…The possibility of taking into account the component spares of a HVDC link in the computation of A S can be very useful in order to optimize the spare management. This target can be achieved by exploiting the Markov state space diagrams [11][12][13]. By considering a single component of a HVDC point-to-point system, it is possible to analytically represent, in matrix form, the transitions of the component from one particular state to the other, with any spare management configuration.…”
Section: Markov State Space Diagramsmentioning
confidence: 99%
“…The use of overhead lines or submarine/underground cables, or a combination of them, generates different issues and have pros and cons depending on the type of application [16][17][18]. Effective reliability and availability assessment tools [19][20][21][22][23][24][25][26][27][28][29][30] are of paramount importance in order to safely manage a whole HVDC-VSC link and to minimize the system outage risk.…”
Section: Introductionmentioning
confidence: 99%