Abstract: Poor energy performance of existing buildings worldwide has led to a crucial need to retrofit existing buildings to minimise energy consumption. Among the existing buildings, hotels use as much as 50% of their total expenses on energy and offer significant opportunities for energy efficiency improvement. Yet, comparatively the level of implementation of energy retrofits found to be low, which has attributed to, inter alia, the absence of a clearly defined process for ensuring the delivery of energy retrofit pr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 27 publications
0
2
0
Order By: Relevance
“…According to respondent IH1R2, 'if there is significant potential for saving, but no enough capability to proceed with a retrofit project, then we have to make another decision, that is to still proceed with the project by obtaining the assistance of an ESCO or drop the project' (indicated by the 2 nd decision point in Figure 2). If an organisation decides to obtain the assistance of an ESCO, the project in turn becomes an outsourced ER project, which generally follows a different decision-making process (refer Fasna and Gunatilake, 2019).…”
Section: Pre-retrofit Phase Of Er Projectsmentioning
confidence: 99%
“…According to respondent IH1R2, 'if there is significant potential for saving, but no enough capability to proceed with a retrofit project, then we have to make another decision, that is to still proceed with the project by obtaining the assistance of an ESCO or drop the project' (indicated by the 2 nd decision point in Figure 2). If an organisation decides to obtain the assistance of an ESCO, the project in turn becomes an outsourced ER project, which generally follows a different decision-making process (refer Fasna and Gunatilake, 2019).…”
Section: Pre-retrofit Phase Of Er Projectsmentioning
confidence: 99%
“…It is essential to take these steps to make a proper decision on outsourcing. Because, with regard to what has been said, outsourcing, along with many benefits, creates serious risks for the company (Fasna and Gunatilake, 2019). One of the benefits of the three-step decision-making process is identifying ways to prevent the failure of outsourcing.…”