2022
DOI: 10.3390/machines10070508
|View full text |Cite
|
Sign up to set email alerts
|

Order-Driven Dynamic Resource Configuration Based on a Metamodel for an Unbalanced Assembly Line

Abstract: Resource-constrained product general assembly lines with complex processes face significant challenges in delivering orders on time. Accurate and efficient resources allocation of assembly lines remain a critical factor for punctual order delivery, full use of resources and associated customer satisfaction in complex production systems. In order to quickly solve the order-based dynamic resource allocation problem, in this paper a metamodel-based, multi-response optimization method is proposed for a complex pro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 48 publications
0
0
0
Order By: Relevance
“…The above works in the literature only develop research on production problems from a steady-state perspective. When considering large-scale production operations, transient processes are often insignificant compared to the overall production duration, rendering steady-state analysis viable [13]. Nevertheless, in scenarios subject to frequent changes in orders and physical systems, such as in the manufacture of aircraft, ships, multivariant furniture production plants, and the assembly lines for customized personal laptop computers, steady-state analysis may lack sufficient precision [14].…”
Section: Introductionmentioning
confidence: 99%
“…The above works in the literature only develop research on production problems from a steady-state perspective. When considering large-scale production operations, transient processes are often insignificant compared to the overall production duration, rendering steady-state analysis viable [13]. Nevertheless, in scenarios subject to frequent changes in orders and physical systems, such as in the manufacture of aircraft, ships, multivariant furniture production plants, and the assembly lines for customized personal laptop computers, steady-state analysis may lack sufficient precision [14].…”
Section: Introductionmentioning
confidence: 99%