Proceedings of SPE International Conference on Horizontal Well Technology 1998
DOI: 10.2523/50405-ms
|View full text |Cite
|
Sign up to set email alerts
|

Optimum Fluid Design for Drilling and Cementing a Well Drilled with Coil Tubing Technology

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractThis paper describes the strategy, design and the drilling fluid and cement operations in the first two wells drilled with Coil Tubing on the Gullfaks field. The strategy and design is explained in great detail. Excellent hole cleaning was achieved in both wells.A serious problem of differential sticking was eliminated by a radical change in drilling fluid strategy and design. It was possible to successfully drill a 3 ¾" hole, log and run/cement a 2 7/8" line… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2000
2000
2002
2002

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance