2015
DOI: 10.1080/17480930.2014.994734
|View full text |Cite
|
Sign up to set email alerts
|

Optimum cut-off grade’s calculation in open pit mines with regard to reducing the undesirable environmental impacts

Abstract: Cut-off grade -a criterion used to discriminate ore from waste -has direct impact on mineable reserves and average grade of the materials that must be processed. The most comprehensive method for determination of optimum cut-off grades in metal deposits with the goal of maximising the net present value is provided by Lane's algorithm. Lane's algorithm includes income and the production costs of the final product, mining, processing and refinery capacities and grade distribution of the ore deposit, but he did n… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
4
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 23 publications
(7 citation statements)
references
References 7 publications
1
4
0
Order By: Relevance
“…Taking Lane's algorithm as a basis, Asad and Topal [5] demonstrated the combined impact of introducing economic parameters, escalation and stockpiling options into the cut-off grade optimization model. Consistent with the research of Asad and Topal [5], Narrei and Osanloo [6] provided a model for the determination of cut-off grades in open-pit mines. In addition to the costs associated with the management and reclamation of waste dumps, tailing dams, and pits, possible incomes from reclamation are also considered in this model.…”
Section: Introductionsupporting
confidence: 67%
“…Taking Lane's algorithm as a basis, Asad and Topal [5] demonstrated the combined impact of introducing economic parameters, escalation and stockpiling options into the cut-off grade optimization model. Consistent with the research of Asad and Topal [5], Narrei and Osanloo [6] provided a model for the determination of cut-off grades in open-pit mines. In addition to the costs associated with the management and reclamation of waste dumps, tailing dams, and pits, possible incomes from reclamation are also considered in this model.…”
Section: Introductionsupporting
confidence: 67%
“…The scholars advocated utilizing the Analytical Hierarchy Process (AHP) and the technique for order preference by similarity to ideal solution (TOPSIS) to analyze post-mining land usage using the economy, social, technical, and mine site evaluation (Soltanmohammadi et al, 2010). Then, the other scholars analyzed post-mining land use using entropy, weighted least squares, and AHP techniques (Narrei and Osanloo, 2011). The combination of PROMENTHEE and SIR techniques is used to analyze post-mining land use (Amirshenava and Osanloo, 2017).…”
Section: Mined Land Evaluationmentioning
confidence: 99%
“…Therefore, to successfully implement the reclamation plan, its costs should be incorporated into the mine planning and design. Besides, considering these costs in the mine planning and design is one of the main requirements for achieving SD and performing responsible mining [5][6][7][8][9][10]. To this end, mine reclamation costs should be estimated at an acceptable level of confidence at the preliminary stages of the MMLC [11].…”
Section: Introductionmentioning
confidence: 99%