2018
DOI: 10.1007/s13762-018-2010-6
|View full text |Cite
|
Sign up to set email alerts
|

Optimum coverage of irrigation canals to minimize evaporation and maximize dissolved oxygen concentration: case study of Toshka, Egypt

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 14 publications
(9 citation statements)
references
References 8 publications
0
3
0
Order By: Relevance
“…(a) Lining canals using plain concrete over dolomite stones; (b) geocell grid material (MWRI, 2005); (c) proposed floated photovoltaic cells of Sheikh Zayed canal (El Baradei & Al Sadeq, 2019; El Baradei & Sadeq, 2020)…”
Section: Methodsmentioning
confidence: 99%
“…(a) Lining canals using plain concrete over dolomite stones; (b) geocell grid material (MWRI, 2005); (c) proposed floated photovoltaic cells of Sheikh Zayed canal (El Baradei & Al Sadeq, 2019; El Baradei & Sadeq, 2020)…”
Section: Methodsmentioning
confidence: 99%
“…Additionally, the uncontrolled Toshka spillway starts releasing the water towards the Toshka depression after the water level reaches above 178 m. Mubarak Pumping Station, located on the left bank of the reservoir, pumps water into El Sheikh Zayed Canal flowing to the Toshka Project. The New Valley Project in Toshka was developed in the Western Desert by the Egyptian government along with the huge Mubarak Pumping Station with a maximum discharge of 300 m 3 /s [59].…”
Section: Aswan High Dam Reservoir Case Studymentioning
confidence: 99%
“…(El Baradei and Al Sadeq, 2019). The model estimated daily evaporation flux per unit length of SZC (𝑞 𝑣 ) using,…”
Section: Evaporation and Seepage Lossesmentioning
confidence: 99%
“…As open channel construction cost constitutes a major part of the cost of flood protection and water supply projects, optimization of open channel design is important for cost reduction and for achieving project economic feasibility, particularly for long-distance, large-capacity open channels. Furthermore, optimizing the design of open channels may aid in saving water lost by evaporation and seepage, which is particularly important for water supply projects in regions suffering from water scarcity (El Baradei and Al Sadeq, 2019).…”
Section: Introductionmentioning
confidence: 99%