Handbook of Wind Energy Aerodynamics 2021
DOI: 10.1007/978-3-030-05455-7_61-1
|View full text |Cite
|
Sign up to set email alerts
|

Optimizing Wind Farm Layouts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 59 publications
0
1
0
Order By: Relevance
“…421 MW of wind power was decommissioned in Europe in 2018. 18 It is estimated that 424 to 3305 GW of wind power will be installed by 2040, 19 each of those wind turbines having a lifetime of 20–30 years and containing 25 to 65 kg of NdFeB magnets 20 per GW and 10 tonnes of blade materials 21 per GW. A significant proportion of PGMs supply comes from recycling, 22 with 37 tons of waste PGMs produced from end-of-life vehicles in China alone in 2020.…”
Section: Introductionmentioning
confidence: 99%
“…421 MW of wind power was decommissioned in Europe in 2018. 18 It is estimated that 424 to 3305 GW of wind power will be installed by 2040, 19 each of those wind turbines having a lifetime of 20–30 years and containing 25 to 65 kg of NdFeB magnets 20 per GW and 10 tonnes of blade materials 21 per GW. A significant proportion of PGMs supply comes from recycling, 22 with 37 tons of waste PGMs produced from end-of-life vehicles in China alone in 2020.…”
Section: Introductionmentioning
confidence: 99%