2009
DOI: 10.2175/193864709793901374
|View full text |Cite
|
Sign up to set email alerts
|

Optimizing Nitrogen and Phosphorus Removal At The Broad Run Water Reclamation Facility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2009
2009
2010
2010

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Membrane bioreactor (MBR) is becoming an established technology in treatment of municipal wastewater, with a number of installations in the biological nutrient removal exceeding capacity of 50 ML/d (Canham 2009). Initially the membrane module was utilized outside the reactor in an external configuration.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Membrane bioreactor (MBR) is becoming an established technology in treatment of municipal wastewater, with a number of installations in the biological nutrient removal exceeding capacity of 50 ML/d (Canham 2009). Initially the membrane module was utilized outside the reactor in an external configuration.…”
Section: Introductionmentioning
confidence: 99%
“…This configuration, called a submerged membrane bioreactor (SMBR) was used to lower the energy costs in smaller installations (Ueda et al, 1997;Yamamoto et al, 1989). Today, most full scale larger MBR are conventionally designed as a system of a separate bioreactor tank with mixed liquor flowing to separate tank housing the submerged membranes (Canham 2009).…”
Section: Introductionmentioning
confidence: 99%