2023
DOI: 10.1111/itor.13414
|View full text |Cite
|
Sign up to set email alerts
|

Optimizing job shop scheduling with speed‐adjustable machines and peak power constraints: A mathematical model and heuristic solutions

S. Mahdi Homayouni,
Dalila B.M.M. Fontes

Abstract: This paper addresses a job shop scheduling problem with peak power constraints, in which jobs can be processed once or multiple times on either all or a subset of the machines. The latter characteristic provides additional flexibility, nowadays present in many manufacturing systems. The problem is complicated by the need to determine both the operation sequence and starting time as well as the speed at which machines process each operation. Due to the adherence to renewable energy production and its intermitte… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 40 publications
(56 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?