Optimizing effort and time parameters of COCOMO II estimation using fuzzy multi-objective PSO

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(8 citation statements)
references
References 13 publications
0
8
0
Order By: Relevance
“…The capacity of a budget estimating model is determined by calculating its bias, stability, and precision. Measures of bias, stability, and precision are concerned with the average difference between actual and the estimated costs, considering both the degree of variation around the average and the combination with bias and consistency [12]. By far, the most popular evaluation criteria used involve statistics such as mean, standard deviation, and coefficient of variation [10].…”
Section: Article Historymentioning
confidence: 99%
See 2 more Smart Citations
“…The capacity of a budget estimating model is determined by calculating its bias, stability, and precision. Measures of bias, stability, and precision are concerned with the average difference between actual and the estimated costs, considering both the degree of variation around the average and the combination with bias and consistency [12]. By far, the most popular evaluation criteria used involve statistics such as mean, standard deviation, and coefficient of variation [10].…”
Section: Article Historymentioning
confidence: 99%
“…Effort and schedule are two parameters and outcomes that define the quality of any software product. An effort is the amount of labor required to complete a task, measured in person-month units [12]. Schedule simple means the amount of time required to complete the job, which is proportional to the effort.…”
Section: Cocomo Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…Langsari and Sarno [27] suggested hybrid models by using the COCOMO II and fuzzy logic to estimate the project cost. Esteki et al [28] suggested the augmentation of the cost control methods with a risk management framework.…”
Section: Related Workmentioning
confidence: 99%
“…The essential part of using artificial intelligence (AI) in software effort estimation is the construction of the Artificial Neural Network (ANN) architecture [11]. ANNs have learning adaptability and are good at modeling complex nonlinear relationships.…”
Section: Introductionmentioning
confidence: 99%