2021
DOI: 10.1155/2021/8820287
|View full text |Cite
|
Sign up to set email alerts
|

Optimized Partition Scheme for Prefabricated Underpass with Large Cross Section

Abstract: With the acceleration of urbanization in China, more underpasses will be constructed in big cities to alleviate the great traffic pressure. The prefabricated and assembly construction method has been introduced to replace the traditional cast-in-place method to achieve quick construction. However, for a fully prefabricated and assembled underground structure (PAUS) with large cross section, the structure must be cut into segments in transverse direction to reduce the size and weight for easy transportation and… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 10 publications
(7 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?